01543 876124

Barlaston First School – Wrap Around Care and Nursery Building

Posted By: adminadmin
Posted On: February 26, 2020
Posted In:
Modular Nursery Staffordshire

6-Bay Modular Nursery and Wrap Around Care Unit – Barlaston First School

Amanda Clarey, headteacher at Barlaston First School approached us with a view to providing a wrap around care unit for before and after school clubs whilst also being able to operate as a pre-school during school hours. We provided prices for both new and refurbished modular classrooms in different sizes and layout options. The option that suited the school best was a refurbished six bay modular building measuring an unusual 14.4m x 9.0m.

We had initial chats at our Hixon office and at the school to discuss where would be the best location within the schools grounds to site the building. We discussed the contract at length with the school and it was agreed that we would provide a full turn-key contract including all professional services such as planning and building applications.

This particular job was certainly a challenge from the drawn out planning process though the installation on the second day back from the Christmas period. Our office team and site team really pulled together to bring the whole contract to a fantastic conclusion and the school are now in and operating in their new building.

Tell Us About The Building!

As mentioned above, the building was a 14.4m x 9.0m, six bay modular building which was fully refurbished.

Modular Nursery Features

  • Full Steel Chassis
  • New Firestone Roof Blank
  • Cedar Clad Exterior
  • Plastisol Fascia
  • New Double Glazed Windows – Toughend Glass
  • LED Lighting
  • Carpet and Vinyl Flooring
  • Infant Toilets with Bespoke Cubicles
  • 80sq/m Open Classroom Area
  • DDA Toilet
  • Office
  • Storage
  • Kitchen Area
  • Classroom Basin and Infant Height Basin for Brush Washing ETC.
Modular Nursery Staffordshire

Need help

or advice

REQUEST A CALL BACK
?