Barlaston First School

Posted By: adminadmin
Posted On: February 26, 2020
Posted In:
portable nursery building

6-Bay Modular Nursery and Wrap Around Care Unit – Barlaston First School

Amanda Clarey, headteacher at Barlaston First School approached us with a view to providing a wrap around care unit, for before and after school clubs, whilst also being able to operate as a pre-school during school hours. We provided prices for both new and refurbished modular classrooms in different sizes and layout options. The option that suited the school best was a refurbished six bay modular building, measuring an unusual 14.4m x 9.0m.

We had initial chats at our Hixon office (and at the school) to discuss where to site the building and where the best location would be within the schools grounds. We discussed the contract at length with the school and it was agreed that we would provide a full turn-key contract including all professional services such as planning and building applications.

From the drawn out planning process, through to the installation on the second day back from the Christmas period – this particular job was certainly a challenge! Our office team and site team really pulled together to bring the whole contract to a fantastic conclusion and the school are now in and operating in their new building.

Barlaston First School Gallery

Tell Us About The Building!

As mentioned above, the building was a 14.4m x 9.0m, six bay modular nursery building which was fully refurbished.

Modular Nursery Features

  • Full Steel Chassis
  • New Firestone Roof Blank
  • Cedar Clad Exterior
  • Plastisol Fascia
  • New Double Glazed Windows – Toughend Glass
  • LED Lighting
  • Carpet and Vinyl Flooring
  • Infant Toilets with Bespoke Cubicles
  • 80sq/m Open Classroom Area
  • DDA Toilet
  • Office
  • Storage
  • Kitchen Area
  • Classroom Basin and Infant Height Basin for Brush Washing etc.

Other posts you may be interested in:

Whitgreave Primary School

15 Bays Delivered to Whitgreave Primary School to Create 6 New Modular Classrooms In June 2019, Whitgreave Primary School approached us with the idea of bringing their infant school onto the same site as their junior school. One of our sales team attended the site to discuss with the school leaders what their ideas were. [...]

Newport Girls High School

5-Bay Double Modular Classroom for Newport Girls High School Double Modular Classroom on Hire to Newport Our customer contacted us in early November 2020. They were in a situation where they needed to hire a double modular classroom. It needed to be installed before Christmas and be ready for use in the New Year due [...]

Leicester High School for Girls

Leicester High School for Girls - 7 Bay Music Rooms and Caretakers’ Accommodation Leicester High School for Girls first approached MPB Ltd in Autumn 2017 requesting a site visit to discuss the removal of an old temporary classroom and to be replaced by new music rooms and caretakers’ accommodation. The building was installed during the [...]

Need help

or advice

REQUEST A CALL BACK
?