6-Bay Modular Nursery and Wrap Around Care Unit – Barlaston First School

Amanda Clarey, headteacher at Barlaston First School approached us with a view to providing a wrap around care unit, for before and after school clubs, whilst also being able to operate as a pre-school during school hours. We provided prices for both new and refurbished modular classrooms in different sizes and layout options. The option that suited the school best was a refurbished six bay modular building, measuring an unusual 14.4m x 9.0m.

IMG 7255 768x1024 1

We had initial chats at our Hixon office (and at the school) to discuss where to site the building and where the best location would be within the schools grounds. We discussed the contract at length with the school and it was agreed that we would provide a full turn-key contract including all professional services such as planning and building applications.

From the drawn out planning process, through to the installation on the second day back from the Christmas period – this particular job was certainly a challenge! Our office team and site team really pulled together to bring the whole contract to a fantastic conclusion and the school are now in and operating in their new building.

Modular Nursery Features

Full Steel Chassis
New Firestone Roof Blank
Cedar Clad Exterior
Plastisol Fascia
New Double Glazed Windows – Toughend Glass
LED Lighting
Carpet and Vinyl Flooring
Infant Toilets with Bespoke Cubicles
80sq/m Open Classroom Area
DDA Toilet
Office
Storage
Kitchen Area