Refurbished 5 Bay Delivered to Blackpool Gateway Academy for Hire
We have delivered and installed a refurbished 5 bay to Blackpool Gateway Academy. This building has two classrooms, two store cupboards for each classroom and a lobby area, for a 1 year modular classroom hire.

What went into the refurbishment?
As with all our refurbishments, we painted the external walls. We then changed the lighting to LED strip lights which are more energy efficient. New double glazed windows were installed along with new doors. When we refurbish a building, we check the current electrics and then change them if they are not up to code. The school also requested that outdoor lighting was included on the building. New carpets were put down and the interior walls were painted to give the classrooms and other areas a new, fresh finish.
Installation
As this is a hire building, we used Jackpads as the foundations. This system is usually used when buildings are installed for a temporary amount of time unlike traditional slab foundation pads. A crane was used to lift the buildings off the lorries and put into place onto the foundations. The building was connected to the power mains by an electrician contracted by MPB Ltd.
Once the building was installed, our customer expressed how impressed they were with the building and how smoothly the installation went.
“Exceptionally well-constructed under the professional eye of Adam (Foreman). We are very grateful for the manner in which Adam led the team during the three days this week.”
Get a Quote
If you’re considering buying or hiring a modular classroom, nursery or building for other amenities or curriculum purposes, then why not get in touch with a knowledgeable member of our team? Our speedy lead times and competitive prices mean that you could be benefitting from a new modular building for your educational establishment sooner than you thought possible.
Email: admin@mpbltd.co.uk
Call: 01889 271406