Double Classroom for Knole Academy

Successful Design, Manufacture, Delivery, and Installation of a 5-Bay Modular Classroom Building at Sevenoaks School in Kent with Concrete Foundations and Building Control Compliance
Providing a Durable and Relocatable Solution for Increasing Student Population with Efficient and Timely Delivery and Installation
Project Value £120,000.00

A modular wooden classroom with a decking staircase, with trees and blue sky in the background.

We have recently (October 2022) completed the installation of a 5-bay double classroom at Knole Academy in Sevenoaks, Kent. The school business manager enquired about providing extra classroom spaces for 60 pupils. The school turned to our company for the design, manufacture, delivery, and installation of the new structure.

The building was designed to be modular, with five individual sections that would be bolted together to create the overall structure. This approach allows for easy expansion or relocation of the building in the future, if needed.

To ensure the building met all necessary building regulations, we provided concrete foundations for the building. The concrete foundations were designed to provide a stable base for the building, our company provided a full building control package complete with a final certificate of completion, ensuring that the building met all necessary building codes and regulations.

The manufacturing process for the building was done in-house, with a focus on using high-quality materials and adhering to strict quality control standards. This ensured that the building would be durable and long-lasting.

Once the building was complete, it was delivered to the school in five individual sections, each of which was transported on a rigid lorry. A mobile crane was used to lift and place each section into position, with a highly qualified team overseeing the installation process.

The installation of the modular classroom was done on a contract lift, which allowed for a smooth and efficient process. The team was able to complete the installation within the agreed-upon timeframe, and the school was able to start using the new classrooms as soon as possible.

In conclusion, the design, manufacture, delivery, and installation of the 5-bay modular classroom building for Knole Academy in Kent was a success. The modular design allows for future expansion or relocation, the concrete foundations were compliant with building regulations and our company provided a full building control package complete with a final certificate of completion. The delivery and installation process was completed smoothly and efficiently. The school was able to start using the new classrooms in a timely manner, which helps to accommodate the increasing student population.

Project Tags
#ModularClassroomBuilding #SevenoaksSchool #Kent #ConcreteFoundations #BuildingControlCompliance #DeliveryAndInstallation #StudentPopulation #Efficient #Timely